Wardrobe Installation Services in Ireland
Fitted wardrobes turn awkward bedroom space into usable storage, and in Ireland they are usually built around the shape of the room rather than bought as a flat-pack unit. A typical job covers sliding or hinged doors, a carcass of shelves, rails and drawers, and a frame scribed to the ceiling, chimney breast or sloped wall. Because every bedroom is a different size, most installers price the work after seeing the space, so the first step is a visit or a detailed set of measurements and photographs. You describe the room, the storage you want and any finish you have in mind; the installer then measures, checks levels and prepares a written quotation. The work itself is carpentry: fixing battens or a frame to the wall, building and levelling the units, hanging doors so they run true, and finishing edges and skirting neatly. Old wardrobes, if any, are usually removed first, and the room needs to be clear enough to work in. Whether the job is a single reach-in wardrobe or a full wall of floor-to-ceiling storage, the same sequence applies: measure, quote, agree a start date, install, snag.
What shapes the price of wardrobe installation
- Volume is the first factor: a single two-door wardrobe uses far less board, hardware and time than a full wall run with internal drawers.
- Access matters just as much.
- A ground-floor bedroom with a wide doorway is straightforward, while a tight stairs, a narrow landing or an upper floor with no lift adds carrying time and careful handling of long panels.
- Room condition shapes the price too: out-of-true walls, sloping ceilings, exposed pipes, old skirting or a chimney breast all need scribing and packing out, and a room that has just been plastered may need extra care.
- Materials and finish change the figure again.
- Standard white or oak-effect board sits at one end, spray-finished or solid-timber doors and soft-close runners at the other, and glass, mirror or bespoke handles add further.
- Internal layout is part of it, since drawers, shoe racks, tie pulls and a mix of hanging and shelving take longer to build than plain rails.
- Removal and disposal of old units, and any making good or painting after installation, are usually listed separately so you can see what each part of the job costs.
How long wardrobe installation takes
A straightforward reach-in wardrobe is often a one to two day installation once the units are made, while a full wall of fitted storage with drawers and sliding doors can run to three or four days on site. If the doors or panels are made to order, there is usually a lead time between measuring and fitting, and that gap is worth asking about at quotation stage. Realistic start dates depend on the installer's current schedule and on how quickly you confirm the design and pay any deposit. Spring and the months before Christmas tend to be busier, so a job agreed in a quiet period may start sooner. Weather rarely stops indoor work, but a very cold snap can affect adhesives and finishes, and a house that is being plastered or rewired needs to be dry and clear first. Ask for a written window rather than a single day, and keep the room emptied of furniture and belongings before the team arrives so the work is not delayed.
What to ask before you hire
- 01Ask for the quotation in writing and check that it separates labour, materials, hardware and any removal or disposal, so you can compare like with like.
- 02Ask whether VAT is included and at what rate, and whether the figure is fixed or an estimate that can move if the room reveals something unexpected.
- 03Ask about insurance: a sole trader or company carrying out carpentry in your home should hold public liability cover, and you can ask to see the certificate.
- 04Ask which professional body they are a member of, and whether they hold any trade qualification in carpentry or joinery.
- 05Ask who will actually do the work, whether an apprentice or sub-contractor will be on site, and how long they expect to be in the house each day.
- 06Ask who tidies up afterwards, whether packaging and offcuts are taken away, and whether the price includes making good any marks to walls, ceilings or floors.
- 07Ask what happens if a door or runner is damaged or faulty, how long the hardware guarantee runs, and whether they will return to adjust doors that settle after a few weeks.
- 08Finally, ask for the start date and completion date in writing, and agree how any extra work will be priced before it begins.
Wardrobe installation guides
All guides →



How to Pressure Wash a Driveway Safely in IrelanHow to Pressure Wash a Driveway Safely in Ireland
9 min read
Explore other service categories that might interest you:
Wardrobe installation questions people ask
How long does it take to install a fitted wardrobe?
Most single wardrobes are fitted in one to two days, while a full wall of storage with drawers and sliding doors can take three to four days. The exact time depends on the size of the run, how many internal fittings you choose, and how much scribing the walls and ceiling need.
Do I need to empty the bedroom before the installer arrives?
Yes, clear the room as much as you can before work starts. Installers need floor space to lay out panels, and furniture, clothes and fragile items in the way slow the job down. If old wardrobes are being removed, empty them first and agree in advance who takes the units away.
Can a fitted wardrobe be built around a sloped ceiling or chimney breast?
Yes, fitted wardrobes are commonly built around sloped ceilings, chimney breasts and awkward corners. The installer scribes the frame to follow the shape of the room, which is one reason the job is priced after a visit or detailed measurements rather than from a standard catalogue size.
What is the difference between sliding and hinged wardrobe doors?
Sliding doors run on tracks and need no clearance in front, which suits narrow bedrooms. Hinged doors swing open and give full access to the whole interior at once, but you need space to open them. Sliding systems usually cost more in hardware, while hinged doors are simpler to adjust.
Should I ask for a written quote before any work begins?
Yes, always ask for a written quotation that lists labour, materials, hardware, VAT and any removal or disposal separately. A written figure lets you compare installers fairly and gives you something to refer back to if the scope of the job changes once the room is opened up.
How soon can the work usually start after I accept a quote?
Start dates vary with the installer's schedule and any made-to-order lead time for doors and panels. Some jobs begin within a few weeks, others take longer in busy periods. Ask for a written start and completion window, and confirm the design and any deposit promptly so the slot is held.
Need wardrobe installation in Ireland?
Post a wardrobe installation task. Your task stays open for 30 days. Providers registered in this category can see it.
Post a wardrobe installation taskNo obligation to hire.Offer wardrobe installation on ShamFix
This listing is for wardrobe installation work in Ireland. Register so customers posting in this category can find your profile.
Register as a providerPosting a task on ShamFix costs nothing today.